

Mahindra XEV 9S prices increased by up to Rs 70,000 in July 2026 — Variant-wise breakdown
- 1Pack One Above variants have become Rs 70,000 more expensive
- 2Pack Two Above 79 variant has received a price hike of Rs 49,000
- 3Mahindra XEV 9S prices now start from Rs 20.65 lakh and go up to Rs 29.95 lakh
After reducing prices for the XEV 9e, Mahindra has now increased prices for the XEV 9S in July 2026. The three-row electric SUV sees price hikes across its lineup, with the entry-level Pack One Above variants receiving the biggest increase of Rs 70,000 on both the 59kWh and 79kWh versions. Meanwhile, the Pack Two Above 79 gets the smallest hike of Rs 49,000.
Mahindra XEV 9S prices revised in July 2026 — Check 59kWh variant-wise hikes

| Mahindra XEV 9S | Battery | Old price | New price | Difference |
|---|---|---|---|---|
| Pack One Above 59 | 59kWh | Rs 19,95,000 | Rs 20,65,000 | Rs 70,000 |
The Mahindra XEV 9S Pack One Above 59 receives the biggest price hike in the 59kWh range. It is now Rs 70,000 more expensive, with its ex-showroom price increasing from Rs 19.95 lakh to Rs 20.65 lakh.
Mahindra XEV 9S 70kWh latest price after the July 2026 revision
| Mahindra XEV 9S | battery pack | Old price | New price | Difference |
|---|---|---|---|---|
| Pack Two Above 70 | 70kWh | Rs 24,45,000 | Rs 25,05,000 | Rs 60,000 |
Moving to the 70kWh battery lineup, the Mahindra XEV 9S Pack Two Above 70 has become Rs 60,000 costlier. Following the July 2026 revision, its price has gone up from Rs 24.45 lakh to Rs 25.05 lakh (ex-showroom).
Also Read: Mahindra Scorpio Classic prices hiked in July 2026 — What's changed and what hasn't
Mahindra XEV 9S 79kWh prices this month
| Mahindra XEV 9S | battery pack | Old price | New price | Difference |
|---|---|---|---|---|
| Pack One Above 79 | 79kWh | Rs 21,95,000 | Rs 22,65,000 | Rs 70,000 |
| Pack Two Above 79 | 79kWh | Rs 25,45,000 | Rs 25,94,999 | Rs 49,999 |
| Pack Three 79 | 79kWh | Rs 27,35,000 | Rs 27,85,000 | Rs 50,000 |
| Pack Three Above 79 | 79kWh | Rs 29,45,000 | Rs 29,95,000 | Rs 50,000 |
The 79kWh Mahindra XEV 9S lineup sees mixed price revisions. The Pack One Above 79 gets the largest increase of Rs 70,000, taking its price from Rs 21.95 lakh to Rs 22.65 lakh. The Pack Two Above 79 receives the smallest hike of Rs 49,999, with its price now at Rs 25.95 lakh. Meanwhile, both the Pack Three 79 and Pack Three Above 79 are Rs 50,000 more expensive, now priced at Rs 27.85 lakh and Rs 29.95 lakh, respectively (all prices ex-showroom).
New Mahindra XEV 9S battery specs

| Specification | Pack One Above | Pack Two Above | Pack Three | Pack Three Above |
|---|---|---|---|---|
| Battery | 59kWh & 79kWh | 70kWh & 79kWh | 79kWh | 79kWh |
| Power | 231PS & 286PS | 245PS & 286PS | 286PS | 286PS |
| Torque | 380Nm | 380Nm | 380Nm | 380Nm |
| Drive Type | RWD | RWD | RWD | RWD |
Range (MIDC P1 + P2) | 521 km & 679 km | 600 km & 679 km | 679 km | 679 km |
The Mahindra XEV 9S comes with three battery options. The smallest is 59kWh and delivers 231PS, the mid-size pack is 70kWh with 245PS, and the largest is 79 kWh producing 286PS. All versions offer a peak torque of 380Nm and come with a rear wheel drive setup.
In terms of range, the 59kWh battery is claimed to cover 521km, the 70kWh version reaches around 600 km, and the 79 kWh pack goes up to 679km.
Also Read: MG unveils MG ADAPT — One platform for EV, hybrid, plug-in hybrid and REEV
New Mahindra XEV 9S charger options

| Specification | Pack One Above | Pack Two Above | Pack Three | Pack Three Above |
|---|---|---|---|---|
Charger Type / Charging Standard | CCS2 | |||
AC Portable Charger | 13A (upto 3.2 kW), compatible with household 3-pin 16A socket | |||
AC Wall Charger Options | 7.2 kW (Available as an accessory) & 11.2 kW options | |||
AC Charging Time (0–100% SOC) | 59 kWh: 6/8.7 h (11.2 kW / 7.2 kW charger) 79 kWh: 8/11.7 h (11.2 kW / 7.2 kW charger) | 70 kWh: 7/10.2 h (11.2 kW / 7.2 kW charger) 79 kWh: 8/11.7 h (11.2 kW / 7.2 kW charger) | 79 kWh: 8/11.7 h (11.2 kW / 7.2 kW charger) | 79 kWh: 8/11.7 h (11.2 kW / 7.2 kW charger) |
DC Charging time (20-80% SOC) | 59kWh: 20 min (with 140 kW/400A charger input) 79kWh: 20 min | 59kWh: 20 min (with 140 kW/400A charger input) 79kWh: 20 min | 79kWh: 20 min charger input) | 79kWh: 20 min charger input) |
The new Mahindra XEV 9S charges at different speeds depending on the charger you use. With the 11.2 kW AC charger, it goes from 0 to 100% in about 8 hours. If you use the 7.2 kW AC charger, a full charge takes closer to 11.5 hours. On a DC fast charger you can get from 20% to 80% in just 20 minutes.
Stay updated with all the latest happenings & developments in the automotive world by joining our official AUTOVERSE WhatsApp community.




















